The 10-storey Marassi Park ... MEP works in progress.

Eagle Hills Diyar, the pioneer behind the iconic Marassi Al Bahrain, said Marassi Park, a residential development on the Grand Boulevard at Diyar Al Muharraq, has reached 40 per cent of construction, with completion set for end of Q3, 2023.

The 10-storey building is currently cast up to level 9. The blockwork, aluminium, and mechanical, electrical and plumbing (MEP) works are currently in progress, and a mock-up was due to be ready by end of last month (August). The total site area is 7,333 sq m while the gross floor area (GFA) is 25,500 sq m.

Designed by Gulf House Engineering (GHE) architecture firm, Marassi Park consists of one building with three connected blocks housing a total of 249 units. Residents of the project will have easy access to the Marassi beach front, as well as several nearby amenities including a gymnasium, adult’s and children’s swimming pools and a 2-km promenade, in addition to being in close proximity to the upcoming Marassi Galleria Mall.

Future residents can obtain financing from an array of mortgage options available at their preferred bank.