Project Type: Real Estate/Residential                      
Estimated Completion: Q1 2016    
Estimated Value: $217.5 million                                  
Status: Under execution                                 
Location:
Downtown Dubai, UAE                              


PROJECT DETAILS

Emaar Properties is on track with its plans to build the Burj Vista towers in Downtown Dubai, UAE.

The construction contract was awarded to Consolidated Contractors Company in May 2014, while the MEP sub contract was awarded in September to Bilt Middle East.

The project aims at the development of two residential towers of 66 and 22 floors offering 120 and 520 luxury apartments in one, two, and three-bedroom layouts.

Burj Vista is located walking distance from The Dubai Mall and close to the upcoming Opera District, and the central business district of Dubai. The towers will be directly linked to the newly opened pedestrian link that connects the Dubai Metro station with Downtown Dubai. The boulevard level of the towers will feature several high-end retail outlets and restaurants.

Other facilities include a fully-equipped gymnasium, children’s play areas, multimedia hall, business centre, retail centre, lounge areas, swimming pool and kid’s pool, badminton and half a basketball court, relaxing reading areas, lushly landscaped areas and a mini theatre.

Adrian Smith and Gordon Gill Architecture is the design consultant, Turner International Middle East is the PMC and Red Engineering will undertake the MEP consultancy.

SCOPE OF WORK

Construction of two residential towers of 66 and 22 floors, offering 120 and 520 luxury apartments including facilities such as :
- Fully-equipped gymnasium
- Children’s play areas
- Multimedia hall
- Business centre
- Retail centre
- Lounge areas
- Swimming pool and kid’s pool
- Badminton and half a basketball court
- Relaxing reading areas
- Lushly landscaped areas
- Mini theatre


COMPANIES & PROJECT PERSONNEL

*Owner: Emaar Properties
Address:
Building 3, Sheikh Zayed Road, Emaar Malls Square, PO Box 9440, Dubai, UAE
Tel: +971 4-367-3333
Fax: +971 4-367-3000
Email: info@emaar.ae
Website: www.emaar.com

Contact Name: Abdul Wahid Aboush
Position: Sales Assistant Manager
Tel: +971 4-367-5568

Contact Name: Hiba El Beleidy
Position: Investor Relation
Email: helbeleidy@emaar.ae

*PMC Consultant: Turner International Middle East Limited
Address:
Gulf Towers, Block A2 Oud Metha Street, PO Box 13036, Dubai, UAE
Tel: +971 4-337-0990
Fax: +971 4-334-8216
Email: info@tcco.com
Website: www.turnerconstruction.com

Contact Name: Husein Odeh
Position: General Manager, Turner Arabia
Email: hodeh@tcco.com

*Design Consultant: Adrian Smith and Gordon Gill Architecture
Address:
111 West Monroe, Suite2300, Chicago Illinois 60603, USA
Tel: +1 312-920-1888
Fax: +1 312-920-1775
Email: info@smithgill.com
Website: www.smithgill.com

Contact Name: Carrie Niell
Position: Marketing Manager
Email: carrieniell@smithgill.com

*MEP Consultant: Red Engineering
Address:
Al Shafar Tower, Tecom C, PO Box 27793, Dubai, UAE
Tel: +971 4-447-7281
Fax: +971 4-447-7253
Email: dubai@red-eng.com

*Infrastructure (Piling) Contractor: National Services and Contracting Company International
Address:
P O Box 29259, Sharjah, UAE
Tel: +971 6 559 4299
Fax: +971 6 559 4044
Email: sharjah@nsccme.com

*Construction Contractor: Consolidated Contractors International Company
Address:
Etihad Tower 3, 12th and 48th Floor, Sheikh Khalifa Bin Zayed Street, PO Box 224, Abu Dhabi, UAE
Tel: +971 2-555-3656, +971 2-614-7516
Fax: +971 2-555-3641
Email: cccuae@emirates.net.ae
Website: www.ccc.gr/

*MEP Sub-Contractor Bilt Middle East LLC
Address:
Al Diyar Building, Ground Floor, Sheikh Zayed Street, Bur Dubai Area, PO Box 2393, Dubai, UAE
Tel: +971 4-343-9798, +971 4-343-9444
Fax: +971 4-343-9445
Email: abmbilt@emirates.net.ae, abmbilt@eim.ae 
Website
: www.bilt.ae

Contact Name: Ahmed Al Quda
Position: Tendering Engineer
Tel: +971 2-614-7567

TIMELINE

October 2014 – Construction was ongoing.

September 2014 - the MEP subcontract was awarded to Bilt Middle East LLC.

June 2014 - Bids for the MEP subcontract were submitted.

June 2014 - The ITB for the MEP subcontract was issued and construction works started.

May 2014 - The construction contract was awarded to Consolidated Contractors Company.

March 2014 -The bids for the construction contract were submitted.

March 2014 - The ITB for the construction contract was issued.

March 2014 - pilling works were completed by National Services & Contracting.

Q4 2013 - the project resumed after being put on hold since 2009.



 

B